Teeyer Whole Production Line,including 6 processing sections
1.Raw Material Processing Section
The initial stage of the autoclaved aerated coagulation production involves the meticulous handling of essential raw materials, including sand (fly ash), lime, cement, gypsum, and aluminum powder (aluminum paste), setting the foundation for a robust process.
This crucial segment specializes in the refined processing and systematic storage of these vital raw materials, ensuring a seamless workflow.
2.Automatic Steel Mesh Fabricating
&Circulation
Serving as the heart of autoclaved aerated concrete slab production, this section is indispensable for high-quality output.
This area is dedicated to the fabrication of the essential steel mesh (mesh cage) for autoclaved aerated concrete plates, incorporating both manual and automatic mesh handling, alongside the efficient automatic circulation of assembly frames.
3.Pouring and pre-curing section
This pivotal section stands as a cornerstone in the creation of autoclaved aerated concrete slabs, facilitating intricate processes with precision.
It is instrumental in the formation of the steel mesh (mesh cage) necessary for autoclaved aerated concrete plates, managing both manual and automatic mesh suspension and enabling the smooth automatic circulation of the assembly frame.
4.Cutting section
In this stage, the mold frame containing the billet body undergoes meticulous demudding via a turning crane. The blank body, coupled with the side plate, is precisely placed on the cutting car, where a comprehensive cutting process—encompassing side, horizontal, and vertical cutting—finalizes the product's shape.
Post-cutting, the ground turning table efficiently removes and recycles corner waste, ensuring no material is wasted.
Subsequent to waste removal, the blank body is expertly handled by the marshalling crane and marshalling ferry car, completing this stage of production.
5.Autoclaving section
The assembled cakes undergo a meticulous journey into the autoclave, where they experience constant pressure maintenance facilitated by the advanced traction mechanism and ferry cart, ensuring perfect curing conditions.
Once the curing process is complete, the autoclave-treated products are efficiently pulled out by the ferry cart, proceeding to the finished product packaging section.
6.Finished Products
Classification&Packaging
Following their emergence from the autoclave, the cakes are meticulously sorted, palletized, and securely packed. Utilizing advanced packaging and conveying equipment, they are then transported to the storage yard, ready for distribution, ensuring a flawless end to the production line.
Company Introduction
Discover the World of TEEYER. At Teeyer Intelligent Equipment Corp., Ltd., we pride ourselves as experts and pioneers in the field of autoclaved aerated concrete block production equipment. Our commitment to quality and innovation sets us apart as a leading manufacturer.
For nearly three decades, we have dedicated ourselves to the art and science of designing and manufacturing comprehensive AAC block production lines and construction equipment accessories. Our expertise extends from initial design concepts to impeccable after-sale service, ensuring a seamless experience. Our extensive production line features an array of essential components including a robust jaw crusher, state-of-the-art AAC cutting machine, sophisticated autoclave, efficient separator, and a host of supplementary accessories.
Our Workshops and Equipment:
Teeyer is home to 8 specialized workshops, each outfitted with cutting-edge processing equipment that stands at the forefront of international standards. Our arsenal includes precision Cutting equipment such as a plasma cutting machine imported from Sweden and an advanced laser cutting machine. In the domain of Metal plate processing, we boast a formidable 2000-ton hydraulic press. Our Machining equipment lineup features a Taiwan vertical machining center, a CNC gantry boring and milling machine, and a horizontal machining center.
This array of high-end equipment ensures the utmost accuracy, formidable strength, and unwavering stability of our complete AAC equipment sets, delivering unparalleled performance and reliability.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams.
Teeyer's Moment in the Limelight On October 23, 2023, Teeyer achieved a significant milestone by being successfully listed on the Main Board of the Shanghai Stock Exchange. Celebrated as "the first listed company of China AAC Equipment Supplier," this achievement marks a new era of growth and recognition for our brand.
Teeyer Project Display
South Korea EP Group Project
Achieving a remarkable 300,000 m3 per year, this AAC Block Production Line sets a benchmark in construction excellence.
Bahrain NCC Project
Producing an impressive 200,000 m3 per year, this AAC Block Production Line is a testament to our innovative engineering.
Indonesia Superior Prima Sukses
6Delivering a substantial 600,000 m3 per year, our AAC Block Production Line empowers large-scale construction projects.