Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
The raw materials crucial for autoclaved aerated coagulation include sand (or fly ash), lime, cement, gypsum, and *** (or paste). These components lay the foundation for superior AAC products.
This pivotal section manages the meticulous processing and secure storage of all essential raw materials.
2. Automatic Steel Mesh Fabricating & Circulation
This section is the heart of the autoclaved aerated concrete slab production, ensuring precision and efficiency.
This core section is dedicated to the fabrication of steel mesh (mesh cages) necessary for AAC plates, encompassing both manual and automatic mesh hanging, along with seamless assembly frame circulation.
Expertly designed to fabricate the steel mesh required for AAC plates, this section automates both the hanging of the mesh and the circulation of assembly frames, streamlining the entire process.
3. Pouring and Pre-curing Section
Central to producing high-quality AAC slabs, this section ensures precision in pouring and pre-curing.
Facilitates the intricate process of making steel mesh (mesh cages), manual or automatic hanging of mesh, and seamless circulation of assembly frames, ensuring high standards in AAC production.
4. Cutting Section
In this phase, the mold frame loaded with the billet body undergoes demudding via the crane. The blank body, along with the side plate, is then carefully placed on the cutting car, achieving precise side, horizontal, and vertical cuts for perfect molding.
The cut body is then processed by the ground turning table, which efficiently removes and recycles corner waste, ensuring minimal material loss.
Post-waste removal, the blank body is expertly handled by the marshalling crane and marshalling ferry car, preparing it for the next stages.
5. Autoclaving Section
Using advanced traction mechanisms, the assembled cakes are transported into the autoclave tanks for consistent pressure maintenance. The ferry cart ensures smooth transfer into the autoclaves.
After curing, products are deftly pulled out by the ferry cart and conveyed to the packaging section, ready for the finishing touches.
6. Finished Products Classification & Packaging
Once the cakes are steamed out of the autoclave, they are meticulously sorted, palletized, packed, and transported to the storage yard by our state-of-the-art packaging and conveying equipment.
Our sophisticated packaging and conveying systems ensure that the autoclaved cakes are efficiently sorted, palletized, packed, and delivered to the storage yard in pristine condition.
Welcome to TEEYER! Teeyer Intelligent Equipment Co., Ltd. stands as a distinguished leader in the manufacturing of autoclaved aerated concrete (AAC) block production equipment.
For nearly three decades, we have excelled in designing and manufacturing comprehensive AAC block production lines and construction equipment accessories. Our expertise extends from initial design to exceptional after-sale service. Our complete production lines feature jaw crushers, AAC cutting machines, autoclaves, separators, and a wide array of essential accessories.
Our Workshops and Equipment:
Teeyer boasts 8 state-of-the-art workshops, equipped with cutting-edge international processing equipment. Our high-tech machinery includes: Cutting Equipment: plasma cutting machines imported from Sweden, laser cutting machines; Metal Plate Processing Equipment: 2000-ton hydraulic presses; Machining Equipment: Taiwan vertical machining centers, CNC gantry boring and milling machines, horizontal machining centers.
This suite of high-end equipment guarantees the precision, durability, and stability of our complete AAC equipment sets.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Highlight Moment A milestone achievement: On October 23, 2023, Teeyer was proudly listed on the Main Board of the Shanghai Stock Exchange, earning the title of 'the first listed company of China AAC Equipment Supplier'.
Prestigious South Korea EP Group Project
Pioneering 300,000 m3 per year, AAC Block Production Line
Innovative Bahrain NCC Project
Robust 200,000 m3 per year, AAC Block Production Line
Renowned Indonesia Superior Prima Sukses
600,000 m3 per year, Advanced AAC Block Production Line