Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
AAC Production Process
Teeyer Whole Production Line,including 6 processing sections |
1.Raw Material Processing Section
The raw materials used in autoclaved aerated coagulation production are typically sand (fly ash), lime, cement, gypsum, and the crucial aluminum powder (or paste), forming the essential foundation for our high-quality products.
This section is dedicated to the meticulous processing and secure storage of raw materials, ensuring quality at every step.
2.Automatic Steel Mesh Fabricating
&Circulation
This pivotal section forms the heart of the autoclaved aerated concrete slab production, crucial for delivering robust and reliable products.
In this section, the essential steel mesh (or mesh cage) required for the slabs is crafted. This includes manual and automatic hanging, alongside a seamless automatic assembly frame circulation.
3.Pouring and Pre-curing Section
This core section is indispensable for the production of autoclaved aerated concrete slabs.
Here, the essential steel mesh (mesh cage) is crafted, involving manual and automatic hanging and the systematic automatic circulation of the assembly frame.
4.Cutting Section
The mold frame, laden with billet body, undergoes demudding via the turning crane. It is then delicately placed on the cutting car, where precise side, horizontal, and vertical cuts bring the product to perfect form.
The refined cutting process is accomplished by the ground turning table, efficiently removing and recycling corner waste, thus optimizing resource usage.
Following waste removal, the blank body is expertly handled by the marshalling crane and ferry car, ensuring seamless movement and processing.
5.Autoclaving Section
Carefully assembled cakes are transported into the autoclaves for consistent pressure maintenance, facilitated by the traction mechanism and ferry cart, ensuring superior quality.
Once perfectly cured in the autoclave, products are expertly extracted by the ferry cart and conveyed to the finished product packaging area, ready for dispatch.
6.Finished Products
Classification & Packaging
Post-autoclaving, the cakes are meticulously sorted, palletized, and packed. They are then transported to the storage yard by advanced packaging and conveying equipment, ready for delivery.
Company Introduction
Welcome to the World of TEEYER, where innovation meets precision. Teeyer Intelligent Equipment Corp., Ltd. stands as a beacon of expertise in manufacturing high-quality autoclaved aerated concrete block production equipment.
For nearly 30 years, we have been dedicated to the art and science of designing and crafting state-of-the-art AAC block production lines and construction equipment accessories. Our comprehensive service provides seamless solutions from initial design to exceptional after-sales support. Our sophisticated production line incorporates advanced machinery, including jaw crushers, AAC cutting machines, autoclaves, separators, and a wide array of essential accessories, each designed to perfection.
Our World-Class Workshops and Cutting-Edge Equipment:
Teeyer proudly houses 8 modern workshops, fully equipped with internationally advanced processing machinery, including: Cutting equipment such as the plasma cutting machine imported from Sweden and high-precision laser cutting machines; Metal plate processing equipment featuring a mighty 2000-ton hydraulic press; and sophisticated machining equipment such as a Taiwan vertical machining center, CNC gantry boring and milling machines, and horizontal machining centers.
This ensemble of high-end equipment guarantees unparalleled accuracy, robust strength, and unwavering stability for our comprehensive set of AAC equipment, ensuring that every piece meets the highest standards of excellence.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Milestone Achievement
On October 23, 2023, Teeyer proudly ascended to a new pinnacle by being successfully listed on the Main Board of the Shanghai Stock Exchange, earning the prestigious distinction of being celebrated as "the first listed company of China's AAC Equipment Supplier".
Teeyer Project Display
South Korea EP Group Project
An impressive 300,000 m3 per year capacity, AAC Block Production Line, engineered to perfection.
Bahrain NCC Project
A remarkable 200,000 m3 per year capacity, AAC Block Production Line, designed for efficiency.
Indonesia Superior Prima Sukses
A robust capacity of 600,000 m3 per year, AAC Block Production Line for high-volume output.Zhejiang Rongshen Project, China
Zhejiang Rongshen Project, China
A groundbreaking 500,000 m3 per year AAC Block & Panel Production Line, featuring China's pioneering Green Cake Separator Equipment for eco-friendly operations.