Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
AAC Production Process
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
The essential raw materials instrumental in the creation of autoclaved aerated coagulation include sand (or fly ash), lime, cement, gypsum, and aluminum powder (or paste). These components synergize to form a robust foundation for high-quality production.
This crucial phase involves meticulous processing and secure storage of the raw materials, ensuring they are prepped to perfection for the next stages.
2. Automatic Steel Mesh Fabricating
& Circulation
This pivotal section serves as the heart of the production process, dedicated to crafting autoclaved aerated concrete slabs with precision and excellence.
Here, we precisely manufacture the steel mesh cages essential for the concrete plates. This process encompasses both manual and automated mesh hanging, along with the seamless circulation of the assembly frame.
3. Pouring and Pre-curing Section
This is another core stage in producing top-notch autoclaved aerated concrete slabs, focusing on exact pouring techniques and optimal pre-curing conditions.
It involves crafting the required steel mesh cages for concrete plates, using both manual and automated hanging methods, alongside efficient assembly frame circulation.
4. Cutting Section
The mold frame, loaded with the billet body, undergoes careful demudding via a crane. Subsequently, the blank body, along with the side plate, is placed on a cutting car, where precise side, horizontal, and vertical cuts shape the final product.
The ground turning table facilitates the removal and recycling of corner waste, ensuring environmental responsibility throughout the cutting process.
Once the waste is efficiently removed, the marshalling crane and ferry car complete the blank body handling, maintaining impeccable organization.
5. Autoclaving Section
Assembled product cakes are carefully ushered into the autoclave for consistent pressure maintenance, utilizing the traction mechanism and ferry cart for smooth operations.
Post-autoclave, the cured products are skillfully extracted and transported to the finished product packaging area, facilitated by the efficient ferry cart system.
6. Finished Products
Classification & Packaging
Steamed cakes are meticulously sorted, palletized, and packed, before being conveyed to storage. Sophisticated packaging and conveying equipment ensure seamless operation and product integrity.
Company Introduction
Step into the world of TEEYER, where innovation meets expertise. Teeyer Intelligent Equipment Corp., Ltd. stands tall as a premier manufacturer dedicated to the crafting of superior autoclaved aerated concrete block production equipment.
With an illustrious history spanning around 30 years, we specialize in the design and fabrication of AAC block production lines and essential construction equipment accessories. Offering a comprehensive suite of AAC production solutions, we handle everything from initial design concepts to exemplary after-sale services. Our all-encompassing production line features state-of-the-art jaw crushers, precision AAC cutting machines, robust autoclaves, efficient separators, and an array of indispensable accessories.
Our Workshops and Equipment:
Teeyer boasts 8 cutting-edge workshops, each equipped with a plethora of internationally advanced processing equipment, including: High-precision cutting tools like plasma cutting machines imported from Sweden, and advanced laser cutting machines; powerful metal plate processing tools such as a 2000-ton hydraulic press; top-tier machining devices like the Taiwan vertical machining centers, CNC gantry boring and milling machines, and horizontal machining centers.
These premium, high-end machines guarantee the precision, durability, and unwavering stability of our complete AAC equipment sets.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Moment of Glory
On October 23, 2023, Teeyer achieved a remarkable milestone by being listed on the Main Board of the Shanghai Stock Exchange, earning the prestigious title of "the first listed company of China AAC Equipment Supplier".
Teeyer Project Display
South Korea EP Group Project - A testament to cutting-edge technology and superior craftsmanship, tailored specifically for the South Korean market.
300,000 m3 per year, AAC Block Production Line - Experience unmatched production capabilities with our state-of-the-art AAC Block production line, delivering an impressive 300,000 cubic meters annually.
Bahrain NCC Project - Discover the pinnacle of engineering and design with the Bahrain NCC project, a shining example of our commitment to quality and innovation.
200,000 m3 per year, AAC Block Production Line - Our efficient AAC Block Production Line ensures a robust output of 200,000 cubic meters per year, setting new standards in the industry.
Indonesia Superior Prima Sukses - A visionary project that underscores our dedication to delivering top-tier equipment and solutions to the Indonesian market.
6 - An integral component of our comprehensive AAC solutions, this product exemplifies precision and performance.00,000 m3 per year, AAC Block Production Line - Elevate your production capabilities with our AAC Block Production Line, engineered for optimal performance and reliability.
Zhejiang Rongshen Project, China - A hallmark project within China that reflects our commitment to excellence and sustainable development.
500,000 m3 per year, AAC Block & Panel Production Line, with Chinese First Green Cake Separator Equipment - Unleash unprecedented production potential with our advanced AAC Block & Panel Production Line, augmented by the pioneering Green Cake Separator Equipment, leading the way in eco-friendly and efficient manufacturing.