Teeyer Whole Production Line,including 6 processing sections
1.Raw Material Processing Section
In the initial phase of our advanced AAC production, we meticulously select and process premium raw materials. Our choice includes sand (fly ash), lime, cement, gypsum, and aluminum powder (aluminum paste), each chosen for its superior quality and contribution to the final product.
This pivotal section is dedicated to the precise processing and strategic storage of our carefully chosen raw materials, ensuring the foundation for superior product quality.
2.Automatic Steel Mesh Fabricating
&Circulation
As the heart of our AAC slab production, this section ensures precision and efficiency in every step.
Our state-of-the-art system fabricates steel mesh (mesh cage) essential for AAC plates. It seamlessly integrates manual and automatic mesh hanging with a sophisticated automatic circulation assembly frame, setting the standard for innovation.
3.Pouring and pre-curing section
At this crucial phase, we lay the groundwork for exceptional AAC slab production, ensuring each component contributes to a flawless end product.
Featuring a cutting-edge system for steel mesh fabrication, this section integrates both manual and automated mesh handling, complemented by a dynamic circulation of assembly frames for unmatched efficiency.
4.Cutting section
During this meticulous stage, the mold frame with the billet body undergoes a transformative process. Using state-of-the-art technology, we demold with precision, reposition onto the cutting car, and execute precise side, horizontal, and vertical cuts to achieve the perfect shape.
Our innovative ground turning table seamlessly manages cut body processing, efficiently removing and recycling corner waste to minimize material loss.
Post waste removal, the blank body is elegantly maneuvered by the marshalling crane and ferry car, ready for the next stage.
5.Autoclaving section
In this essential phase, our expertly assembled cakes enter the autoclave, where they undergo precise constant pressure maintenance, facilitated by cutting-edge traction and ferry mechanisms.
Once the autoclave curing process is complete, our ferry cart smoothly extracts the products, delivering them to the finished product packaging section for the final touches.
6.Finished Products
Classification&Packaging
Post-steaming, our expertly crafted cakes undergo meticulous sorting and palletizing. Our packaging and conveying equipment then carefully pack and transport the finished products to the storage yard, ensuring they are ready for delivery.
Company Introduction
Welcome to TEEYER. At Teeyer Intelligent Equipment Corp., Ltd., we proudly stand as a leading professional manufacturer dedicated to the production of autoclaved aerated concrete (AAC) block equipment.
For nearly three decades, we have specialized in the innovative design and manufacturing of AAC block production lines and essential construction equipment accessories. Our expertise encompasses comprehensive AAC production solutions, spanning from the initial design phase to exemplary after-sale service. Our complete production line includes essential machinery such as jaw crushers, AAC cutting machines, autoclaves, separators, and a host of additional accessories.
Our State-of-the-Art Workshops and Equipment:
Teeyer boasts 8 cutting-edge workshops, equipped with a suite of internationally advanced processing equipment. This includes the latest cutting technology like plasma cutting machines from Sweden and laser cutting machines; metal plate processing equipment such as a 2000-ton hydraulic press; and precision machining tools including Taiwan vertical machining centers, CNC gantry boring and milling machines, and horizontal machining centers.
These high-end pieces of equipment are pivotal in ensuring the precision, strength, and long-lasting stability of our complete range of AAC equipment.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams.
Teeyer's Milestone Achievement On October 23, 2023, Teeyer proudly marked a significant milestone by being successfully listed on the Main Board of the Shanghai Stock Exchange. This achievement has earned us the prestigious recognition as 'the first listed company of a China AAC Equipment Supplier'.
Teeyer Project Display
South Korea EP Group Project - A Testimony of Innovation
Producing an impressive 300,000 m3 annually, this AAC Block Production Line redefines efficiency and sustainability.
Bahrain NCC Project - Crafting a Sustainable Future
Generating a robust 200,000 m3 annually, our AAC Block Production Line is a hallmark of engineering prowess in Bahrain.
Indonesia Superior Prima Sukses - A Beacon of Progress
600,000 m3 per year, AAC Block Production Line seamlessly integrates cutting-edge technology for optimal output.