Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
AAC Production Process
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
This stage is pivotal in our production journey, involving the meticulous handling of essential components such as sand (fly ash), lime, cement, gypsum, and aluminum powder (or paste). These materials lay the foundation for top-tier autoclaved aerated coagulation.
In this section, we expertly process and store the raw materials, ensuring optimal preparation and storage solutions for unmatched product quality.
2. Automatic Steel Mesh Fabricating
& Circulation
At the heart of our production, this section is integral to creating autoclaved aerated concrete slabs, embedding strength and precision at every step.
Here, we craft the essential steel mesh cages for concrete plates with efficiency, using both manual and automatic systems. The assembly frame benefits from a seamless automatic circulation process.
3. Pouring and Pre-curing Section
This crucial section is where the transformative journey of raw materials into robust aerated concrete slabs begins, setting the stage for the next phases of production.
With precision, we manufacture the indispensable steel mesh cages, facilitating both manual and automatic mesh hanging and a sophisticated circulation of assembly frames.
4. Cutting Section
The mold frame, carrying the billet body, undergoes a meticulous demudding process via an overhead crane. The blank body, paired with the side plate, is expertly placed on the cutting car, where it undergoes precise side, horizontal, and vertical cutting to achieve perfect product dimensions.
Post-cutting, the body is efficiently managed by the ground turning table to extract and recycle corner waste, ensuring sustainability.
Subsequently, the blank body is deftly handled by the marshalling crane and ferry car, completing the process with finesse.
5. Autoclaving Section
The carefully assembled cakes are gently ushered into the tanks, where they undergo rigorous pressure maintenance via a traction mechanism and ferry cart, ensuring durability.
Once cured, the robust products are skillfully withdrawn from the autoclave by a ferry cart, ready for the final stage of packaging.
6. Finished Products
Classification & Packaging
Post-autoclaving, the perfectly steamed cakes undergo sorting, palletizing, and packing. They are then efficiently conveyed to the storage yard, ready for delivery, thanks to our state-of-the-art packaging and conveying equipment.
Company Introduction
Welcome to TEEYER, where innovation meets precision. Teeyer Intelligent Equipment Corp., Ltd. is the premier manufacturer in the field of autoclaved aerated concrete block production equipment, setting the industry standard with cutting-edge technology and unparalleled expertise.
For nearly three decades, we have dedicated ourselves to the design and manufacture of top-notch AAC block production lines and construction equipment accessories. At Teeyer, we offer comprehensive AAC production solutions, from meticulous design to exceptional after-sales service. Our complete production line boasts state-of-the-art components including a robust jaw crusher, precision AAC cutting machine, advanced autoclave, efficient separator, and a wide array of essential accessories—each crafted for excellence.
Our Workshops and Equipment:
Teeyer is home to 8 world-class workshops, furnished with high-caliber processing equipment that meets international standards. Our suite includes advanced cutting technology with a plasma cutting machine imported from Sweden and a laser cutting machine. We also feature premier metal plate processing with a 2000-ton hydraulic press, and our machining equipment lineup includes a Taiwan vertical machining center, CNC gantry boring and milling machine, and a horizontal machining center.
These sophisticated, high-end machines ensure the utmost precision, robust strength, and unwavering stability of our complete AAC equipment set, elevating our manufacturing prowess to new heights.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Highlight Moment
On October 23, 2023, Teeyer achieved a monumental milestone by being listed on the Main Board of the Shanghai Stock Exchange, proudly recognized as 'the first listed company of China AAC Equipment Supplier,' marking a new era of growth and innovation.
Teeyer Project Display
South Korea EP Group Project: A Showcase of Excellence
300,000 m3 per year AAC Block Production Line: Delivering Exceptional Quality and Efficiency
Bahrain NCC Project: Setting New Standards in Construction
200,000 m3 per year AAC Block Production Line: Innovative Solutions for Modern Needs
Indonesia Superior Prima Sukses: Commitment to Excellence
600,000 m3 per year: AAC Block Production Line that Redefines Capacity00,000 m3 per year AAC Block Production Line: Ensuring Consistent and Reliable Output
Zhejiang Rongshen Project, China: A Benchmark in Industry Innovation
500,000 m3 per year AAC Block & Panel Production Line: Featuring China's First Green Cake Separator Equipment for Revolutionary Efficiency