Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
In the realm of autoclaved aerated coagulation production, our meticulous selection of raw materials is paramount. We harness the power of sand (fly ash), lime, cement, gypsum, and aluminum powder (or aluminum paste) to create superior quality products.
This pivotal section is dedicated to the precise processing and optimal storage of these essential raw materials, ensuring consistency and quality in production.
2. Automatic Steel Mesh Fabricating
& Circulation
As the heart of our manufacturing process, this section expertly crafts the steel mesh crucial for producing robust autoclaved aerated concrete slabs.
In this phase, we produce the indispensable steel mesh (mesh cage) for autoclaved aerated concrete plates. The process involves both manual and automated techniques for hanging the mesh and seamlessly integrates the automatic circulation of the assembly frame.
3. Pouring and Pre-curing Section
This essential segment ensures the creation of premium autoclaved aerated concrete slabs, setting the stage for quality and durability.
Utilizing advanced methods, this section produces the necessary steel mesh (mesh cage), combining manual and automatic processes for mesh hanging, alongside sophisticated automatic circulation of the assembly frame.
4. Cutting Section
Here, the mold frame, cradling the billet body, undergoes meticulous demudding via the crane. The billet, with its side plate, is adeptly maneuvered onto the cutting car, where precise side, horizontal, and vertical cuts bring the product to life.
Subsequent to the cutting, the ground turning table efficiently removes and recycles any corner waste, ensuring sustainability.
Post-waste removal, the billet body is expertly handled by the marshalling crane and the marshalling ferry car, preparing it for the next phase.
5. Autoclaving Section
The assembled cakes are transported into the autoclave tanks for precise, constant pressure maintenance, facilitated by the advanced traction mechanism and the ferry cart preceding it.
Once cured, the products are gracefully pulled from the autoclave, courtesy of the ferry cart, and delivered to the final packaging section, ready for market introduction.
6. Finished Products
Classification & Packaging
After emerging from the autoclave, the cakes undergo a sophisticated sorting, palletizing, and packing process. Our cutting-edge packaging and conveying equipment ensures they are efficiently transported to the storage yard, perfectly prepared for distribution.
Welcome to TEEYER, where innovation meets expertise. Teeyer Intelligent Equipment Corp., Ltd. stands as a leading and professional manufacturer specializing in the production of autoclaved aerated concrete (AAC) block equipment.
For nearly 30 years, we have dedicated ourselves to the innovative design and precise manufacturing of AAC block production lines and their essential accessories. Our comprehensive services offer expertly crafted AAC production solutions, ranging from initial design through to exceptional after-sale support. The complete production line is inclusive of high-performance components such as jaw crushers, state-of-the-art AAC cutting machines, robust autoclaves, efficient separators, and an array of vital accessories.
Our workshops and equipment:
Teeyer proudly comprises 8 advanced workshops, each outfitted with an array of internationally acclaimed processing equipment. Our cutting-edge lineup includes: Cutting equipment such as plasma cutting machines imported from Sweden and precision laser cutting machines; Metal plate processing equipment like the formidable 2000 tons hydraulic press; and Machining equipment featuring the Taiwan vertical machining center, CNC gantry boring and milling machines, and horizontal machining centers.
These high-end machines ensure that every piece of AAC equipment we produce meets the highest standards of accuracy, strength, and stability, guaranteeing excellence from start to finish.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Highlight Moment On October 23, 2023, Teeyer achieved a significant milestone by being successfully listed on the Main Board of the Shanghai Stock Exchange, celebrated as "the first listed company of China AAC Equipment Supplier." This achievement marks a new era of growth and innovation for our company.
South Korea EP Group Project
Boasting an impressive annual capacity of 300,000 m3, the AAC Block Production Line perfectly meets the requirements for high-volume construction.
Bahrain NCC Project
Crafting 200,000 m3 of AAC Blocks each year, this production line sets a benchmark for efficiency and innovation.
Indonesia Superior Prima Sukses
600,000 m3 per year, this AAC Block Production Line is a powerhouse for delivering substantial building materials swiftly and sustainably.