Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
The raw materials for autoclaved aerated coagulation production typically include sand (fly ash), lime, cement, gypsum, and aluminum powder (aluminum paste), ensuring the highest quality output.
This section is dedicated to the precise processing and meticulous storage of these vital raw materials, guaranteeing consistency and excellence.
2. Automatic Steel Mesh Fabricating
& Circulation
This is the pivotal section for producing high-quality autoclaved aerated concrete slabs, ensuring strength and durability.
This section fabricates the essential steel mesh (mesh cage) required for autoclaved aerated concrete plates, incorporating both manual (automatic) hanging mesh and the seamless automatic circulation of the assembly frame for optimal efficiency.
3. Pouring and Pre-curing Section
Another core section crucial for the production of superior autoclaved aerated concrete slabs, ensuring uniformity and quality.
This section fabricates the essential steel mesh (mesh cage) required for autoclaved aerated concrete plates, incorporating both manual (automatic) hanging mesh and seamless automatic circulation of the assembly frame, enhancing productivity.
4. Cutting Section
In this section, the mold frame loaded with the billet body is demudded using a crane. The blank body, along with the side plate, is placed on the cutting car for precise side, horizontal, and vertical cutting, ensuring perfect dimensions.
The cut body is then managed by the ground turning table to remove and recycle corner waste efficiently, maintaining sustainability.
Subsequently, the blank body is handled by the marshalling crane and the marshalling ferry car for final processing, ensuring smooth transitions.
5. Autoclaving Section
The assembled cakes are sent into the autoclave tank for consistent pressure maintenance using the traction mechanism and the ferry cart, ensuring optimal curing.
Post curing, the autoclaved products are extracted by the ferry cart and transported to the finished product packaging section, ensuring they are ready for the market.
6. Finished Products
Classification & Packaging
After being steamed out of the autoclave, the cakes are meticulously sorted, palletized, packed, and transported to the storage yard using advanced packaging and conveying equipment, ensuring they reach their destination in perfect condition.
Welcome to TEEYER! Teeyer Intelligent Equipment Corp., Ltd. proudly stands as a leader in the manufacturing arena, specializing in state-of-the-art autoclaved aerated concrete (AAC) block production equipment.
For nearly three decades, we have been at the forefront of designing and manufacturing premium AAC block production lines and auxiliary construction equipment. Our expertise spans from the initial design phase through to unparalleled after-sales service. Our robust production line includes jaw crushers, AAC cutting machines, autoclaves, separators, and a wide array of essential accessories.
Our Advanced Workshops and Cutting-Edge Equipment:
Teeyer proudly showcases 8 advanced workshops, equipped with world-class international processing equipment. Our state-of-the-art machinery includes: Cutting Equipment - premium plasma cutting machines imported from Sweden and precision laser cutting machines; Metal Plate Processing Equipment - robust 2000-ton hydraulic presses; Machining Equipment - high-precision Taiwan vertical machining centers, CNC gantry boring and milling machines, and sophisticated horizontal machining centers.
These high-end machines guarantee the precision, durability, and stability of our comprehensive AAC equipment sets, ensuring top-tier quality and performance.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Historic Accomplishment A monumental milestone for Teeyer: On October 23, 2023, we proudly became the first China AAC Equipment Supplier to be listed on the prestigious Main Board of the Shanghai Stock Exchange.
South Korea EP Group Project: A Testament to Unparalleled Quality
300,000 m³ per year, AAC Block Production Line: The Epitome of Efficiency and Scale
Bahrain NCC Project: A Pinnacle of Engineering Precision
200,000 m³ per year, AAC Block Production Line: Unrivaled Capacity and Performance
Indonesia Superior Prima Sukses: Spearheading Market Leadership
600,000 m³ per year, AAC Block Production Line: Pioneering High-Volume Innovation600,000 m³ per year, AAC Block Production Line: Pioneering High-Volume Innovation