Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
AAC Production Process
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
The raw materials integral to the autoclaved aerated coagulation process primarily include sand (fly ash), lime, cement, and gypsum, complemented by aluminum powder (or aluminum paste) and similar essential constituents.
This section is dedicated to the meticulous processing and systematic storage of all raw materials.
2. Automatic Steel Mesh Fabricating
& Circulation
This section stands as the pivotal core for producing autoclaved aerated concrete slabs with unparalleled precision.
Here, the essential steel mesh (or mesh cage) necessary for autoclaved aerated concrete plates is crafted. It involves manual or automatic mesh hanging and leverages automatic circulation for assembly frame management.
3. Pouring and Pre-Curing Section
This highly crucial section plays a central role in the production of autoclaved aerated concrete slabs.
It facilitates the creation of steel mesh (or mesh cage) vital for autoclaved aerated concrete plates, incorporating both manual (automatic) mesh hanging and the seamless automatic circulation of assembly frames.
4. Cutting Section
The mold frame with the billet body undergoes demudding via a turning crane. The blank body, along with the side plate, is positioned on a cutting car, achieving product cutting and molding through precise side, horizontal, and vertical cuts.
The cut body is meticulously completed using a ground turning table, effectively removing and recycling corner waste for optimal material efficiency.
Upon removal of waste, the blank body is expertly managed by a marshalling crane and mobilized by a marshalling ferry car for seamless operation continuity.
5. Autoclaving Section
The assembled product cakes are carefully ushered into the autoclave tanks for constant pressure maintenance by utilizing the traction mechanism and the ferry cart positioned ahead.
Once autoclave curing is complete, the finished products are extracted by the ferry cart and transported to the packaging section, ready for the next phase of production.
6. Finished Products
Classification & Packaging
Post-autoclaving, the steamed cakes are systematically sorted, palletized, and expertly packed. They are then transported to the storage yard with precision using advanced packaging and conveying equipment, ensuring readiness for distribution.
Company Introduction
Welcome to TEEYER, a beacon of excellence in the world of engineering. Teeyer Intelligent Equipment Corp., Ltd. stands as a distinguished and professional leader in the realm of autoclaved aerated concrete block production equipment, offering unmatched expertise and innovation.
For nearly three decades, we have dedicated ourselves to the art and science of designing and manufacturing AAC block production lines and construction equipment accessories. Our offerings encompass a comprehensive range of professional AAC production solutions, guiding you every step of the way from conceptual design to exemplary after-sale service. Our robust production line features a selection of high-grade components including the jaw crusher, AAC cutting machine, autoclave, separator, and an array of essential accessories.
State-of-the-Art Workshops and Equipment:
Teeyer operates across 8 state-of-the-art workshops, each equipped with cutting-edge processing equipment that meets international standards. Our facilities boast advanced tools such as plasma cutting machines imported from Sweden, laser cutting machines for precision, and a 2000-ton hydraulic press for metal plate processing. Additionally, we offer sophisticated machining equipment including a Taiwan vertical machining center, CNC gantry boring and milling machine, and horizontal machining center.
These top-tier pieces of equipment are pivotal in ensuring the precision, strength, and unwavering stability of our complete AAC equipment sets.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Defining Achievement
A momentous occasion for Teeyer unfolded on October 23, 2023, as we proudly became the 'first listed company of China AAC Equipment Supplier' on the Main Board of the Shanghai Stock Exchange, solidifying our position as an industry trailblazer.
Teeyer Project Display
South Korea EP Group Project: A Testament to Our Global Reach and Quality Assurance
An Impressive Capacity of 300,000 m3 per Year, AAC Block Production Line: Tailored for Efficiency and High Performance
Bahrain NCC Project: Engineering Marvels Meeting Market Demands
200,000 m3 per Year, AAC Block Production Line: Optimizing Resources for Maximum Output
Indonesia Superior Prima Sukses: A Partnership in Progress and Innovation
Cutting-edge Technology Supporting a Production Capacity of 600,000 m3 per Year, AAC Block Production Line00,000 m3 per Year, AAC Block Production Line: Exceptional Productivity and Quality Standards
Zhejiang Rongshen Project, China: A Landmark Development with Sustainable Practices
500,000 m3 per Year, AAC Block & Panel Production Line, Featuring China's First Green Cake Separator Equipment: Pioneering a Greener Future