Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
AAC Production Process
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
In the realm of autoclaved aerated coagulation production, we meticulously select premium raw materials such as sand (fly ash), lime, cement, gypsum, and aluminum powder (aluminum paste) to create unparalleled quality.
This essential section is dedicated to the meticulous processing and optimal storage of raw materials, ensuring they are primed for flawless production.
2. Automatic Steel Mesh Fabricating
& Circulation
This pivotal section lies at the heart of producing superior autoclaved aerated concrete slabs, a testament to advanced engineering.
This section deftly crafts the necessary steel mesh (mesh cage) for autoclaved aerated concrete plates, facilitating manual or automatic mesh hanging and ensuring seamless assembly frame circulation.
3. Pouring and Pre-curing Section
This vital section is the cornerstone of manufacturing autoclaved aerated concrete slabs, epitomizing precision and innovation.
Here, the steel mesh (mesh cage) indispensable for the autoclaved aerated concrete plate is expertly crafted, complemented by both manual and automatic hanging mesh and the smooth circulation of the assembly frame.
4. Cutting Section
The mold frame, laden with the billet body, undergoes meticulous demudding via the crane. Positioned on the cutting car, the billet is sculpted to perfection with precise side, horizontal, and vertical cuts.
The expertly cut body is seamlessly processed by the ground turning table, efficiently removing and recycling any corner waste.
Subsequent to waste removal, the billet body is strategically arranged by the marshalling crane and the ferry car for further processing.
5. Autoclaving Section
The meticulously assembled cakes are adeptly ushered into the autoclave for consistent pressure maintenance by the advanced traction mechanism and ferry cart.
The autoclaved, cured products emerge gracefully, guided by the ferry cart to the final destination of the finished product packaging section.
6. Finished Products
Classification & Packaging
Once the cakes are expertly steamed out of the autoclave, they undergo meticulous sorting, palletizing, and packaging. They are then transported to the storage yard by our state-of-the-art packaging and conveying equipment, showcasing the pinnacle of efficiency and care.
Company Introduction
Experience the Excellence at TEEYER! As a distinguished name in the realm of autoclaved aerated concrete block production machinery, Teeyer Intelligent Equipment Corp., Ltd. stands proudly as a leading manufacturer, committed to delivering unparalleled quality and innovation.
With an impressive legacy spanning nearly three decades, our expertise lies in designing and manufacturing state-of-the-art AAC block production lines and construction equipment accessories. We offer comprehensive, professional AAC production solutions, covering every aspect from conceptual design to impeccable after-sale service. Our complete production line is equipped with advanced technology, including jaw crushers, AAC cutting machines, autoclaves, separators, and a myriad of other essential accessories.
Our State-of-the-Art Workshops and Equipment:
Teeyer operates eight cutting-edge workshops, each furnished with internationally advanced processing equipment. Our arsenal includes precision cutting equipment like plasma cutting machines from Sweden and sophisticated laser cutting machines. Our metal plate processing capabilities feature a robust 2000-ton hydraulic press, while our machining expertise is supported by a Taiwan vertical machining center, CNC gantry boring and milling machines, and a horizontal machining center.
These premium, high-tech machines are integral in ensuring the precision, durability, and stability of our complete AAC equipment line, setting industry benchmarks for excellence.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Proud Milestone
In a landmark achievement, Teeyer proudly made its mark as the first AAC Equipment Supplier in China to be successfully listed on the prestigious Main Board of the Shanghai Stock Exchange on October 23, 2023.
Teeyer Project Display
South Korea EP Group Project - Highlighting cutting-edge technology and exceptional engineering.
300,000 m3 per year, AAC Block Production Line - Delivering robust and sustainable construction solutions.
Bahrain NCC Project - A landmark venture showcasing innovation and efficiency in construction materials.
200,000 m3 per year, AAC Block Production Line - Ensuring durable and energy-efficient building materials.
Indonesia Superior Prima Sukses - Aligning modern technology with local expertise for superior results.
600,000 m3 per year, AAC Block Production Line - A testament to our commitment to quality and performance.
Zhejiang Rongshen Project, China - Pioneering advancements in building material solutions within China.
500,000 m3 per year, AAC Block & Panel Production Line, with Chinese First Green Cake Separator Equipment - Leading the way with innovative, eco-friendly technology.