Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
AAC Production Process
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
In the sophisticated art of autoclaved aerated coagulation, we employ an array of essential raw materials. These include sand (fly ash), lime, cement, gypsum, and aluminum powder (or aluminum paste), each playing a pivotal role in crafting our superior AAC products.
This integral section is dedicated to the meticulous processing and secure storage of raw materials essential for high-quality production.
2. Automatic Steel Mesh Fabricating
& Circulation
This stage serves as the pivotal heart of our autoclaved aerated concrete slab production, ensuring consistency and precision at every turn.
Within this section, we expertly craft the steel mesh (mesh cage) indispensable for autoclaved aerated concrete plates. From manual to automatic mesh hanging and the seamless circulation of assembly frames, this operation is a marvel of modern engineering.
3. Pouring and Pre-curing Section
This section is the core powerhouse for producing autoclaved aerated concrete slabs, ensuring optimal consistency and quality.
It is here we fabricate the essential steel mesh (mesh cage) for AAC plates, utilizing both manual and automatic processes for mesh hanging and efficient assembly frame circulation.
4. Cutting Section
The mold frame, laden with the billet body, undergoes a meticulous demudding process via the crane. The blank body, alongside its side plate, is deftly positioned on the cutting car, where it is skillfully transformed through side, horizontal, and vertical cutting.
The precision-cut body is then handled by the ground turning table, efficiently removing and recycling corner waste, ensuring sustainability.
Post-waste removal, the blank body is expertly managed by the marshalling crane and ferry car, readying it for further stages.
5. Autoclaving Section
Through a symphony of engineering, assembled cakes are ushered into the autoclave for consistent pressure maintenance by the traction mechanism paired with the front ferry cart.
Upon completion of autoclave curing, the ferry cart gracefully extracts the products, transporting them to the final packaging section.
6. Finished Products
Classification & Packaging
Freshly steamed cakes are meticulously sorted, expertly palletized, and securely packaged. Our advanced packaging and conveying equipment then transports these pristine products to the storage yard, ready for the world to enjoy.
Company Introduction
Step into the world of TEEYER, where Jiangsu Teeyer Intelligent Equipment Co., Ltd. stands as a beacon of innovation in the realm of autoclaved aerated concrete (AAC) block production machinery. As a distinguished and dedicated manufacturer, we pride ourselves on engineering excellence and top-tier production capabilities.
For nearly three decades, our focus has been unwavering—we specialize in designing and manufacturing top-of-the-line AAC block production lines and construction equipment accessories. Our expertise spans the entire production journey, from initial design to comprehensive after-sales support. The production line is an ensemble of cutting-edge machinery, including jaw crushers, AAC cutting machines, autoclaves, separators, and a variety of indispensable accessories, all synchronized for optimal performance.
Our Workshops and Equipment:
Teeyer boasts 8 state-of-the-art workshops, equipped with a suite of internationally advanced processing machinery. Our cutting-edge arsenal includes precision cutting equipment such as plasma cutting machines imported from Sweden and sophisticated laser cutters. In metal plate processing, we utilize 2000-ton hydraulic presses, while our machining technology features the latest from Taiwan with vertical machining centers, CNC gantry boring and milling machines, and horizontal machining centers.
This high-end machinery is pivotal in ensuring the precision, durability, and stability of our complete AAC equipment sets, making us a leader in quality and innovation.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Moment of Triumph
On October 23, 2023, Teeyer achieved a significant milestone by being successfully listed on the Main Board of the Shanghai Stock Exchange. Celebrated as 'the first listed company of China AAC Equipment Supplier', this achievement underscores our industry leadership and commitment to excellence.
Teeyer Project Display
South Korea EP Group Project: A Landmark in Superior AAC Block Manufacturing.
300,000 m3 per year, AAC Block Production Line: Designed for High Efficiency and Quality Output.
Bahrain NCC Project: Setting New Standards in AAC Production with Advanced Technology.
200,000 m3 per year, AAC Block Production Line: Perfectly Crafted for Optimized Performance.
Indonesia Superior Prima Sukses: Leading the Way in Cutting-edge AAC Block Solutions.
600,000 m3 per year, AAC Block Production Line: A Powerhouse of Capacity and Precision.600,000 m3 per year, AAC Block Production Line: Innovatively Designed for Peak Performance.
Zhejiang Rongshen Project, China: Pioneering Advanced AAC Manufacturing Techniques.
500,000 m3 per year, AAC Block & Panel Production Line, with Chinese First Green Cake Separator Equipment: A Revolutionary Step Towards Sustainable Building Solutions.