Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
AAC Production Process
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
The autoclaved aerated coagulation process begins with an intricate blend of essential raw materials: sand, often in the form of fly ash, combines with lime, cement, and gypsum. To initiate the aeration process, aluminum powder or paste is meticulously added, setting the stage for a superior product.
This critical section is dedicated to the precise processing and systematic storage of the raw materials, ensuring the foundation of our exceptional AAC products.
2. Automatic Steel Mesh Fabricating
& Circulation
The heart of the autoclaved aerated concrete slab production, this section is where the magic happens.
Here, we expertly create the steel mesh (also known as mesh cages) essential for the structure of AAC plates. The process includes both manual and automatic hanging of the mesh and seamless automatic circulation of the assembly frame, ensuring efficiency and precision.
3. Pouring and Pre-curing Section
Serving as another core element in our production line, this section is pivotal for creating top-quality AAC slabs.
Here, meticulous attention is given to crafting the steel mesh (mesh cage) necessary for our AAC plates. Both manual and automated mesh hanging, along with the automatic circulation of the assembly frame, are conducted with precision.
4. Cutting Section
In this section, the mold frame, loaded with the billet body, undergoes careful demudding by an advanced turning crane. The blank body, alongside the side plate, is expertly placed on the cutting car, where it undergoes precise side, horizontal, and vertical cutting to perfect its form.
Using a ground turning table, the cut body is efficiently processed to remove and recycle any corner waste, ensuring sustainability and quality.
Post waste removal, the blank body is meticulously handled by the marshalling crane and marshalling ferry car, completing the preparation for the next production phase.
5. Autoclaving Section
In this stage, assembled cakes are expertly sent into the autoclaves via a precise traction mechanism, where they undergo constant pressure maintenance. The ferry cart is instrumental in managing this seamless transition.
Once the curing is complete, the autoclave products are extracted with care using the ferry cart, then transported to the final destination, the finished product packaging section.
6. Finished Products
Classification & Packaging
Freshly steamed from the autoclave, the cakes are methodically sorted, skillfully palletized, securely packed, and then transported to the storage yard. Our state-of-the-art packaging and conveying equipment ensures a flawless transition to the final storage phase, maintaining the high quality of our AAC products.
Company Introduction
Experience the Excellence at TEEYER! Teeyer Intelligent Equipment Corp., Ltd. stands as a premier manufacturer specializing in state-of-the-art autoclaved aerated concrete block production equipment.
For nearly three decades, we have dedicated ourselves to the art of designing and manufacturing world-class AAC block production lines and construction equipment accessories. Our expertise covers every aspect of AAC production solutions, from initial design stages to impeccable after-sales service. Our comprehensive production line features components such as jaw crushers, AAC cutting machines, autoclaves, separators, and an array of essential accessories.
Our State-of-the-Art Workshops and Equipment:
Teeyer's impressive infrastructure includes 8 cutting-edge workshops, equipped with an array of internationally advanced processing machinery, including: Cutting Equipment: A plasma cutting machine imported from Sweden and top-of-the-line laser cutting machines; Metal Plate Processing Equipment: A 2000-ton hydraulic press; Machining Equipment: A Taiwan vertical machining center, CNC gantry boring and milling machine, and a horizontal machining center.
These superior, high-end machines guarantee the precision, durability, and steadfastness of our complete AAC equipment sets.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Defining Achievement
Teeyer proudly debuted on the Main Board of the Shanghai Stock Exchange on October 23, 2023, earning the distinction of being "the first listed company of China AAC Equipment Supplier".
Teeyer Project Display
South Korea EP Group Project
Pioneering a remarkable production capacity of 300,000 m3 annually, this AAC Block Production Line is a testament to innovative engineering and efficiency.
Bahrain NCC Project
Providing a robust output of 200,000 m3 per annum, this AAC Block Production Line stands out for its precision and reliability.
Indonesia Superior Prima Sukses
600,000 m3 per year, AAC Block Production Line
Zhejiang Rongshen Project, China
Delivering an impressive 500,000 m3 per year of AAC Block & Panel, this production line features China's premier Green Cake Separator Equipment, setting new standards for sustainability and efficiency.