Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
AAC Production Process
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
The foundational ingredients for our autoclaved aerated coagulation production line comprise sand (fly ash), lime, cement, gypsum, aluminum powder (also known as aluminum paste), and more.
This integral stage is dedicated to the efficient processing and secure storage of these key raw materials.
2. Automatic Steel Mesh Fabricating
& Circulation
This critical stage is the heart of our autoclaved aerated concrete slab production line.
Here, we expertly craft steel mesh (mesh cage) essential for autoclaved aerated concrete plates, incorporating both manual (or automatic) mesh hanging and seamless assembly frame circulation.
3. Pouring and Pre-curing Section
This pivotal stage lies at the center of autoclaved aerated concrete slab production.
It facilitates the creation of the steel mesh (mesh cage) necessary for autoclaved aerated concrete plates, featuring manual (or automated) mesh hanging and fluid assembly frame circulation.
4. Cutting Section
The mold frame, cradling the billet body, is demudded using the turning crane. The blank body, alongside the side plate, is then positioned on the cutting car, where precise side, horizontal, and vertical cutting shapes the product.
The ground turning table deftly completes the cut body process, efficiently removing and recycling corner waste.
Once waste is expertly cleared, the blank body is finalized by the marshalling crane and the marshalling ferry car.
5. Autoclaving Section
The assembled cakes are expertly conveyed into the autoclave for constant pressure curing via the traction mechanism and the ferry cart positioned at its forefront.
Our autoclave-cured products are skillfully extracted by the ferry cart and directed towards the finished product packaging section.
6. Finished Products
Classification & Packaging
Post-autoclaving, the cakes are meticulously sorted, palletized, and packed. They are then transported to the storage yard via advanced packaging and conveying equipment, ensuring smooth separation and delivery.
Company Introduction
Welcome to TEEYER, where excellence meets innovation. Teeyer Intelligent Equipment Corp., Ltd. stands as a beacon of expertise in manufacturing cutting-edge autoclaved aerated concrete block production equipment.
For nearly 30 years, we've dedicated ourselves to mastering the design and creation of superior AAC block production lines and construction equipment accessories. Our comprehensive offerings span from meticulous design to seamless after-sale support, ensuring a complete AAC production solution. Our production line is fully equipped with jaw crushers, AAC cutting machines, autoclaves, separators, and an assortment of essential accessories, all crafted for peak performance.
Our State-of-the-Art Workshops and Equipment Suite:
Teeyer boasts 8 technologically advanced workshops, each equipped with state-of-the-art international processing machinery. Our cutting-edge arsenal includes Swedish plasma cutting machines, precision laser cutting technology, and a formidable 2000-ton hydraulic press. Further enhancing our capabilities are Taiwan's vertical machining centers, CNC gantry boring and milling machines, and sophisticated horizontal machining centers.
This array of high-end equipment guarantees unparalleled accuracy, robustness, and reliability across our comprehensive AAC equipment solutions.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Remarkable Achievement
A hallmark of our success, Teeyer proudly debuted on the Main Board of the Shanghai Stock Exchange on October 23, 2023. Celebrated as 'the first listed company of China AAC Equipment Supplier', this milestone underscores our leadership in the industry.
Teeyer Project Display
South Korea EP Group Project - A showcase of excellence and innovation.
300,000 m3 per year, AAC Block Production Line - Efficiently designed to meet your construction needs.
Bahrain NCC Project - Transforming visions into reality with state-of-the-art technology.
200,000 m3 per year, AAC Block Production Line - Delivering consistent quality and performance.
Indonesia Superior Prima Sukses - A testament to superior quality and success.
600,000 m3 per year, AAC Block Production Line - Optimizing production with advanced solutions.
Zhejiang Rongshen Project, China - Pioneering sustainable and innovative construction solutions.
500,000 m3 per year, AAC Block & Panel Production Line, with Chinese First Green Cake Separator Equipment - Setting benchmarks in eco-friendly and efficient production.