Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
AAC Production Process
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
The foundational ingredients for autoclaved aerated coagulation production typically include sand (often sourced from fly ash), lime, cement, gypsum, and aluminum powder or paste.
This vital phase is dedicated to the meticulous processing and strategic storage of all raw materials.
2. Automatic Steel Mesh Fabricating
& Circulation
This segment represents the heart of the process, crucial for crafting durable autoclaved aerated concrete slabs.
This essential segment is designed for the creation of steel mesh (or mesh cage) required for autoclaved aerated concrete plates. It integrates both manual and automated mesh hanging methods and ensures the seamless automatic circulation of the assembly frame, laying down a robust foundation for the construction process.
3. Pouring and Pre-curing Section
This is a pivotal stage in the creation of high-quality autoclaved aerated concrete slabs.
This section is devoted to the precise fabrication of steel mesh (mesh cage) critical for autoclaved aerated concrete plates, encompassing manual (or automatic) mesh hanging and the automated circulation of the assembly framework.
4. Cutting Section
In this phase, the mold frame bearing the billet body undergoes demudding via a turning crane. The blank body, with the side plate, is carefully positioned on the cutting car, where it undergoes a comprehensive cutting process—lateral, horizontal, and vertical—perfectly shaping it into the desired product form.
The process concludes with the innovative ground turning table, which facilitates the efficient removal and recycling of corner waste from the cut body, ensuring minimal waste and a cleaner production environment.
Following waste removal, the blank body is finalized using the marshalling crane and marshalling ferry car, ensuring an efficient and smooth transition to the next phase.
5. Autoclaving Section
The assembled cakes are expertly transported into the tank for sustained pressure maintenance by the precision-driven traction mechanism fronting the autoclaves and the efficient ferry cart preceding it. This ensures consistent quality and strength in the final product.
Post-autoclaving, the cured products are extracted with finesse from the autoclave by the ferry cart and are seamlessly transported to the final product packaging section, maintaining their integrity and quality.
6. Finished Products
Classification & Packaging
The freshly steamed cakes from the autoclave undergo a meticulous sorting process. They are expertly palletized, packaged, and transported to the storage yard by state-of-the-art packaging and conveying equipment, ensuring efficient separation and delivery.
Company Introduction
Welcome to TEEYER, where precision meets innovation. Teeyer Intelligent Equipment Corp., Ltd. proudly leads the field of autoclaved aerated concrete block production equipment, providing top-tier solutions that consistently surpass industry standards.
With an impressive legacy spanning over 30 years, TEEYER is devoted to the craft of designing and manufacturing cutting-edge AAC block production lines and construction equipment accessories. Our all-encompassing solutions cover every detail of the AAC production process, from the initial design phase to unmatched after-sales service. Our complete production line includes precisely engineered components such as the jaw crusher, AAC cutting machine, autoclave, separator, and a wide range of essential accessories, ensuring a seamless and efficient manufacturing process.
Our Workshops and Equipment:
Teeyer proudly operates eight state-of-the-art workshops, each outfitted with cutting-edge processing equipment that aligns with international standards. Our facilities feature an impressive range of advanced tools, including plasma cutting machines imported from Sweden and laser cutting machines for precision cutting, a 2000-ton hydraulic press for robust metal plate processing, and sophisticated machining equipment such as the Taiwan vertical machining center, CNC gantry boring and milling machine, and horizontal machining center. These tools deliver unparalleled precision and efficiency in every product we create.
Such high-end equipment ensures the precision, durability, and reliability of our entire AAC equipment lineup, guaranteeing that our clients receive nothing but the highest quality and performance.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Highlight Moment
Celebrating a landmark achievement, Teeyer became the first AAC Equipment Supplier in China to be listed on the Main Board of the Shanghai Stock Exchange on October 23, 2023. This milestone highlights our unwavering dedication to excellence and innovation in the industry.
Teeyer Project Display
South Korea EP Group Project: A Shining Example of Cutting-Edge Building Innovation
300,000 m3 per year, AAC Block Production Line: Pioneering New Horizons in Construction Technology
Bahrain NCC Project: Leading the Path in Sustainable Building Practices Across the Gulf
200,000 m3 per year, AAC Block Production Line: Enhancing Efficiency and Eco-Friendly Solutions
Indonesia Superior Prima Sukses: Advancing Construction Standards Across Southeast Asia
6: Key Innovations Propelling the Construction Industry to New Heights00,000 m3 per year, AAC Block Production Line: Reshaping the Landscape of Modern Architecture
Zhejiang Rongshen Project, China: A Testament to Cutting-Edge Engineering and Sustainability
500,000 m3 per year, AAC Block & Panel Production Line, featuring China's First Green Cake Separator Equipment: Setting New Standards in Sustainable Manufacturing