Teeyer Whole Production Line,including 6 processing sections
1. Raw Material Processing Section
The raw inputs for creating autoclaved aerated coagulation encompass sand (fly ash), lime, cement, gypsum, and aluminum powder or paste, forming the fundamental components of this innovative building material.
This essential stage is dedicated to the meticulous handling and storage of the raw materials, setting the foundation for optimal production quality.
2. Automatic Steel Mesh Fabricating
& Circulation
This pivotal section is at the heart of producing high-quality autoclaved aerated concrete slabs, ensuring excellence in every piece.
This sophisticated section is designed for crafting the steel mesh (mesh cages) crucial for autoclaved aerated concrete plates, incorporating both manual and automatic mesh hanging, alongside seamless assembly frame circulation.
3. Pouring and Pre-curing Section
This stage represents the central hub for the manufacture of autoclaved aerated concrete slabs, pivotal in achieving the perfect blend and consistency.
Here, the creation of steel mesh (mesh cages) needed for autoclaved aerated concrete plates is executed with precision, utilizing both manual and automatic mesh hanging systems, complemented by efficient assembly frame circulation.
4. Cutting Section
The mold frame, carrying the billet body, is expertly demudded via the turning crane. Subsequently, the blank body, alongside the side plate, is adeptly positioned on the cutting car, where the product undergoes meticulous side, horizontal, and vertical cutting to achieve its final form.
The finished body is efficiently processed by the ground turning table to expertly remove and recycle corner waste, ensuring sustainability.
Post waste removal, the blank body is adeptly managed by the marshalling crane and the marshalling ferry car, ensuring seamless transition to the next stage.
5. Autoclaving Section
The fully assembled cakes are carefully transported into the autoclave for consistent pressure maintenance by the front traction mechanism and the accompanying ferry cart, ensuring uniform curing.
Once cured, the products are expertly extracted from the autoclave by the ferry cart and seamlessly transported to the finished product packaging section, ready for the market.
6. Finished Products
Classification & Packaging
Following the steaming process, the cakes are expertly sorted, palletized, and packaged. They are then efficiently conveyed to the storage yard by the state-of-the-art packaging and conveying equipment, ready for distribution.
Company Introduction
Welcome to TEEYER. Teeyer Intelligent Equipment Corp., Ltd. stands as a distinguished leader in the manufacturing of autoclaved aerated concrete block production equipment, making us your trusted partner in innovation and quality.
For nearly three decades, we have been dedicated to the intricate design and precise manufacturing of AAC block production lines and construction equipment accessories. Our expertise covers every phase from conceptual design to exceptional after-sale service. Our comprehensive production line includes jaw crushers, AAC cutting machines, autoclaves, separators, and a wide array of essential accessories, ensuring seamless operation and superior results.
Our State-of-the-Art Workshops and Equipment:
Teeyer boasts 8 advanced workshops, equipped with cutting-edge processing equipment of international acclaim. Our facilities include cutting-edge plasma and laser cutting machines from Sweden, a 2000-ton hydraulic press for metal plate processing, precision machining tools like the Taiwan vertical machining center, CNC gantry boring and milling machines, and horizontal machining centers.
These high-end pieces of equipment guarantee unparalleled accuracy, robust strength, and unwavering stability for our complete sets of AAC equipment, ensuring you receive nothing but the best.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams.
Teeyer's Landmark Achievement On October 23, 2023, Teeyer proudly marked a milestone by becoming the first listed company of China AAC Equipment Supplier on the prestigious Main Board of the Shanghai Stock Exchange.
Teeyer Project Display
South Korea EP Group Project: Leading Innovation in Construction
AAC Block Production Line: Producing 300,000 m3 per year with Precision and Reliability
Bahrain NCC Project: Pioneering Sustainable Building Solutions
AAC Block Production Line: Crafting 200,000 m3 per year for Superior Quality
Indonesia Superior Prima Sukses: Empowering Growth with Cutting-edge Technology
600,000 m3 per year, AAC Block Production Line: Delivering Excellence in Every Block