Teeyer Main AAC Equipment
Pouring Mixer |
Horizontal Cutting Machine |
Cross Cutting Machine |
Tilting Table |
Finished Product Clamping Hoister |
Separator |
AAC Production Process
Teeyer Whole Production Line,including 6 processing sections |
1. Raw Material Processing Section
The autoclaved aerated coagulation production process begins with the meticulous selection of raw materials. Typically, these materials encompass sand (or fly ash), lime, cement, gypsum, and aluminum powder (or paste), each playing a pivotal role in quality production.
This essential section is dedicated to the sophisticated processing and efficient storage of raw materials, ensuring their optimal condition for the next stages of production.
2. Automatic Steel Mesh Fabricating
& Circulation
This critical phase represents the heart of the autoclaved aerated concrete slab production, where precision and technology converge to achieve excellent results.
This stage is indispensable for crafting the steel mesh, or mesh cage, vital for autoclaved aerated concrete plates. It incorporates both manual and automated processes, facilitating seamless mesh handling and the automatic circulation of the assembly framework.
3. Pouring and Pre-curing Section
This is a core segment of the AAC slab production process, where the foundation for the final product is meticulously laid.
Within this section, the steel mesh essential for concrete plates is expertly crafted. Manual and automatic methods ensure precision in hanging the mesh and achieving efficient assembly frame circulation.
4. Cutting Section
At this cutting-edge section, the mold frame carrying the billet is deftly demudded using a turning crane. Subsequently, the blank, along with its side plate, is meticulously positioned on the cutting car. Here, comprehensive side, horizontal, and vertical cuts are executed to achieve the product's final form.
The cut body undergoes a refined process at the ground turning table, where corner waste is expertly removed and recycled, ensuring minimal waste and maximum efficiency.
Upon removal of waste, the blank is seamlessly handled by the marshalling crane and ferry car, readying it for the subsequent stages.
5. Autoclaving Section
In this critical section, the assembled cakes are carefully introduced into the tank, where they undergo pressure treatment. The process is orchestrated by a traction mechanism and aided by a strategic ferry cart system.
After curing, the autoclaved products are efficiently extracted using a ferry cart. They are then transported to the finished product packaging section, ready for final processing.
6. Finished Products
Classification & Packaging
Emerging from the autoclave, the cakes are expertly sorted, palletized, and packaged. Utilizing advanced packaging and conveying equipment, they are then securely transported to the storage yard, ensuring impeccable quality and readiness for distribution.
Company Introduction
Discover the excellence at TEEYER. As Jiangsu Teeyer Intelligent Equipment Co., Ltd., we stand as a distinguished leader specializing in the manufacture of top-tier autoclaved aerated concrete (AAC) block production equipment. Our reputation is built on quality and innovation.
With a rich legacy spanning nearly 30 years, we excel in crafting superior AAC block production lines and related construction equipment accessories. Our expertise covers the entire process from innovative design to comprehensive after-sales service. Our robust production line features state-of-the-art components including jaw crushers, AAC cutting machines, autoclaves, separators, and a suite of essential accessories.
Our Workshops and Equipment:
Teeyer boasts 8 cutting-edge workshops equipped with internationally advanced processing machinery. Our facilities include top-of-the-line cutting equipment like Swedish-imported plasma cutting machines and laser cutting machines. We also feature formidable metal plate processing tools such as a 2000-ton hydraulic press, along with machining marvels like the Taiwan vertical machining center, CNC gantry boring and milling machines, and horizontal machining centers.
This arsenal of high-end equipment guarantees the precision, durability, and stability of our complete AAC equipment suites, setting industry standards.
Senior Executive and Sales team Teeyer sales team is divided into 8 regional parts, including 5 Chinese sales teams and 3 overseas sales teams. |
Teeyer's Highlight Moment
A hallmark of our success, Teeyer proudly marked its entry onto the Main Board of the Shanghai Stock Exchange on October 23, 2023, celebrated as "the first listed company of China AAC Equipment Supplier." This milestone underscores our leadership and pioneering spirit in the AAC industry.
Teeyer Project Display
South Korea EP Group Project - Elevating Efficiency to New Heights
300,000 m3 per Year - High-Performance AAC Block Production Line
Bahrain NCC Project - Innovating Construction Solutions
200,000 m3 per Year - Cutting-Edge AAC Block Production Line
Indonesia Superior Prima Sukses - Leading the Way in Innovation
6 - Pioneering Capacity for Unmatched Production00,000 m3 per Year - Advanced AAC Block Production Line
Zhejiang Rongshen Project, China - Crafting the Future of Construction
500,000 m3 per Year - State-of-the-Art AAC Block & Panel Production Line Featuring China's First Green Cake Separator Equipment